[00] LE200 Series · Front-loading gas kilns

The LE200
gas kiln,
configured to
your studio.

Five sizes, one philosophy. Every LE200 gas kiln is configured at point of order, fabricated to spec in our City of Industry shop, and crated on a pallet that ships when you say go. No "off the shelf" SKUs. No surprises.

Sizes
5 · 9–40 cu ft
Cone
10 capable
Cert.
ETL · AGA I-94
Built
CA · since 1976
LE200 gas kiln isometric cutaway
Fig. 01 · LE2024 cutaway
NE isometric
[01] · The Line

Five sizes. One philosophy.

Each LE200 is matched to a way of working. The smallest fits in a garage; the largest swallows a class. Pick by capacity, or tell us how you fire and we'll point you to the right one.

Help me pick a size →
Front elevations · not to scale Need bigger? Custom builds to 54+ cu ft on request
[02] · Engineered for the work

The pieces that matter.

These are the parts a serious potter notices. Surfacing them isn't marketing — it's how you'll know this kiln was built for the way you fire.

Frame
Structural steel · 2 crossbeams
The shell is welded mild steel with two full crossbeams. It carries the brick load for the life of the kiln, not the warranty period.
Brick
K-26 / K-28 firebrick, arch built up
Standard build: K-26 (2,600°F) walls and arch over a K-28 (2,800°F) floor and door jamb — rated through Cone 10. Or fiber panels to shed ~35% of ship weight and gain reduction speed.
Burners
True-fire premium-alloy venturi
Ceramic-tip natural-draft burners with direct-spark ignition. Sized at the factory to natural gas or propane — pick one.
Door
Sure-fit hinge, gasketed seal
The hinge is adjustable. As the brick settles and the door drifts, you re-clock it — the seal stays tight for years.
[03] · How it's made

Made to order. Built on a clock.

A base build runs 12-14 weeks, deposit to loading dock. Your exact lead time is locked when you configure.

Wk 0
Configure
Specify size, fuel, insulation, and door hinge. Lock in price and lead time.
Wk 1
Deposit
20% deposit reserves your build slot. We confirm freight to your zip.
Wk 2-8
Fabricate
Frame welded, brick laid, burners tuned, panel wired to your fuel.
Wk 9-10
Test fire
Each kiln is fired to cone 10 before it leaves the shop.
Wk 11-12+
Crate & ship
Crated on a pallet with tail-lift freight delivery. In-studio placement and install available on request.
[04] · Ready when you are

Configure the
kiln your
studio actually
needs.

Five minutes to configure. Lead time and crating quoted on the spot. 20% to reserve your build slot.

Or call 800.4.LAGUNA · M-F 8a-5p PT